THE LABORATORY
BIOTAB ENVIRONNEMENT Inc. laboratory is designed to treat 2 to 4 tons/day of organic domestic waste 6 days per week. It comprises mainly :
A platform for trucks to dump the daily domestic organic waste before are manual for simplified sorting and poured in the hopper of the crusher chopper.
The organic matter delivered to the laboratory, papers and paperboards are finely crushed and directed towards the biométhanisation after being purified if is needed.
The pure organic matter is solubilized and sent by pumping towards the aerobic digester after being desired brought to the temperature (mesophiles fermentation).
The aerobic acidogéne digester receives the organic matter, the leavens and the chemicals.
After a period of approximately 12 hours in the aerobic digester, the effluent is pumped towards the secondary anaerobic digester were is achieves the acétogéne phase during approximately 3 days.
The secondary digester is a perfectly tight tank which contains innovative contact surfaces and which is brewing is done by the recirculation of mud and of the produced biogas.
The methanogene phase, the post-fermentation and decantation of digested organic mud proceeds in a tertiary digester identical to precedent with residence time of approximately 7 to 8 days.
LABORATORY ANNEX To function correctly and to be in conformity with the standards of the environment, the laboratory also includes the following equipments :
A building for the guards The distribution station for low tension Necessary pumps and compressors necessary Boilers and heat exchangers Gasometer for the biogas storage The treatment device for the digested mud The purification device and recycling water The washer The air cleaning device for the laboratory Fire protection The communication system Offices, stores, restroom and workshops Traffic car parks and necessary areas Etc..
ALL THE LABORATORY EQUIPEMENT IS AVAILABLE ON THE MARKET
|